Location: Paso de los Toros, Uruguay
Year: 2023 - 2023
Within the UPM II chemical plant, on the one hand, we performed the assembly and welding of pipes ranging from DN15 to DN700, with a total of 11,790 inches of welding and 2.2 km of piping installed. On the other hand, we also assembled various equipment such as tanks, pumps, filters, heat exchangers, among others.