Location: San José, Uruguay.
Year: 2016
HYUNDAI
Assembly of pipes for the new UTE Combined Cycle Power Plant located in Punta del Tigre. Includes piping assembly in carbon steel, stainless steel, alloy steel GRP, HDPE for a total of approximately 130,000 inches of weld. Includes NDT, paint, condensed steam pipe insulation and ice water.