JOIN THE TEAM

PROJECTS

UPM II - Pipe bridge

Location: Paso de los Toros, Uruguay
Year: 2021 - 2022
Assembly and welding of 2,300 tons of pipes along the entire plant on metallic structures at height. A total of 76 km of pipes were assembled and 145,000 inches were welded. We worked with carbon steel, alloy steel and stainless steel pipes.

MORE PROJECTS