Tetra Pak - Piping
Location: Durazno, Uruguay.
Year: 2014
Assembly of pipes and equipment.
MORE PROJECTS
UPM II - Turbine Building Piping
Location: Paso de los Toros, Uruguay
Year: 2021 - 2023
Within the turbine building, 623 tons of piping were installed with a total of 96,300 welded inches, reaching a length of 13 km of piping. Equipment was also installed for a total weight of 223 tons, including compressors, pumps, dryers, filters, silencers, sampling stations and hydraulic units, among others.
Montes del Plata - Steam piping assembly
Location: Colonia, Uruguay
Year: 2013 - 2014
Assembly and welding of 101 tons of alloy carbon steel pipes, intended to transport steam from the boiler to the turbine. A total of 3,730 inches of welding was performed and 1,000 meters of pipe were installed.